Wednesday, November 2, 2016

Bathroom Remodel: Day 6

 And we're back on track!

It's the sixth actual day of remodeling, but it's been sixteen days since the construction began.

The long-awaited shower pan went in today, and we are very happy we waited for it.  It has a nice ledge at the bottom for soaps and shampoos, which will be helpful because we are not having any ledges built in to the tile on the upper half of the shower.
Some of the structure of the bathroom is up as well. The space behind the shower where the linen closet goes is framed in, and half of the drywall is up. The green, moisture-resistant wall surfaces give the entire bathroom a green glow.  The color does not show up well in this photo, but believe me, I thought for a moment that something was wrong with the shower pan .
At the end of the day our contractor said, "With all the stuff back in there, I am reminded of how small that bathroom really is!"

Indeed.

No comments: